Erving Select Board Approves Bridge Engineering Contract, Restores Radio Funds

ERVING — March 1, 2021 — Erving Select Board unanimously approved a $2,700 engineering contract for the Church Street bridge and restored $75,000 in public-safety radio equipment to the fiscal year 2022 budget at its March 1 meeting. Chair Jacob Smith, Member William Bembury, and Member James Loynd also voted to give a two percent raise to four stipended positions — emergency management director, assistant EMD, IT coordinator, and IT technician — after debating whether current compensation, including a $1,040 IT coordinator stipend, adequately reflects workload that has grown sharply during the pandemic. Police Chief Wonka told the joint board-Finance Committee session that vehicle repeaters are needed because portable radios fail on side streets away from the Route 2 corridor, saying officers on traffic stops "are not going to be able to reach out to dispatch." The Finance Committee accepted the special town meeting warrant covering at least six articles, including a $122,000 public safety budget amendment; a meeting date of late March or early April was under discussion but not formally set.

Keep reading with a 14-day free trial

Subscribe to The Erving MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Erving MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Franklin County News · The Gill Post · The Greenfield Post · The Hawley Post · The Heath Post · The Leverett Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.